Section
51.01 Authority
51.02 Request for service connection; fee
51.03 Activation, disconnection or reconnection; fee
51.04 Water meter installation, reading and testing
51.05 One connection per building required; exception
51.06 Service line limits; adequate plumbing required
51.07 Pipe and plumbing maintenance; Department call-outs
51.08 Water turn-on by authorized personnel
51.09 Bulk water
51.10 Resale of water; servicing other residences
51.11 Fire hydrant usage and metering
51.12 Rate schedule
51.13 Collection of charges; delinquent payments
51.14 Charge adjustment for mechanical malfunctions
51.99 Penalty
Cross-reference:
Water system rates and fees, see Ch. 32