1024.03 PERMIT REQUIRED; FEE.
   No person shall construct a private driveway entrance without first obtaining a permit therefor. Permits for such driveway entrances shall be granted by the Building Department upon written application therefor signed by the owner or construction contractor upon blanks furnished by the Building Department for that purpose. The application shall show the location and dimensions of such driveway entrance and the manner in which it is to be constructed. However, when such driveway entrances are being constructed in connection with building improvements being constructed upon any premises, such application may be made upon the same blanks upon which the building permits are issued. A fee as provided in Section 244.01 shall be charged for each driveway permit. (Ord. 90-90. Passed 12-19-90.)