9-1-116: TOILET FACILITIES REQUIRED DURING CONSTRUCTION:
Before the start of construction of any building or structure, and before any remodel where all toilet facilities are temporarily removed, a temporary water flushed or approved chemical toilet shall be installed for the use of the workers and shall comply with all of the following requirements:
   A.   Such temporary toilet shall be maintained throughout the construction of the building or structure;
   B.   If a water flushed toilet is used, such toilet shall be connected to the sewer, and tile pipe without a vent may be used for the installation;
   C.   Such temporary toilet shall be located within twenty five feet (25') of the rear property line and shall be set back at least twenty feet (20') from any other property line unless the City building official approves an alternate location because the requirements of this subsection prevent servicing the toilet or are otherwise infeasible; and
   D.   Such temporary toilet shall not be located on public property without the approval of the Director of Public Works. (Ord. 16-O-2719, eff. 1-20-2017)