10-3-2905: PROTECTIONS DURING CONSTRUCTION:
The director of building and safety may require any of the following measures to be taken to preserve a protected tree located on a property upon which construction is occurring:
   A.   Install a fence which encloses the extended drip line area of the protected tree.
   B.   Prohibit the penetration or abrasion of the protected tree.
   C.   Any other measures deemed necessary by the Director of Building and Safety. (Ord. 93-O-2176, eff. 8-20-1993)