10-3-2555: PERMIT EXPIRATION:
A Hillside R-1 permit issued pursuant to this article shall expire after a period of three (3) years from the date of approval unless the applicant has begun the physical construction of the buildings or structures authorized by the permit. In addition, a Hillside R-1 permit shall expire with regard to an accessory structure if the accessory structure is permitted at the same time as a primary residence and the physical construction of the accessory structure does not begin within one year after final inspection of the primary residence.
The reviewing authority may grant one extension to the life of the Hillside R-1 permit for a period of up to two (2) years. (Ord. 95-O-2239, eff. 7-7-1995)