Before a building permit is delivered, the inspection and/or other fee(s) shall be paid.
A. Permit Fees: The following fees are established for a building permit, based on the estimated cost of the work. The building inspector shall have the right to verify or correct the estimated cost of any building, structure, alteration, or addition.
Total Fee |
Total Fee | |||
ADA - City plan review | $17.00 | ||
Building (based on estimated cost of work): | |||
$1.00 - $500.00 | 16.00 | ||
$501.00 - $2,000.00 | $16.00 plus $2.00 per $100.00 value | ||
$2,001.00 - $25,000.00 | $50.00 plus $10.00 per $1,000.00 value | ||
$25,001.00 - $50,000.00 | $280.00 plus $7.00 per $1,000.00 value | ||
$50,001.00 - $100,000.00 | $467.50 plus $5.00 per $1,000.00 value | ||
$100,001.00 - $500,000.00 | $705.00 plus $4.00 per $1,000.00 value | ||
$500,001.00 - $1,000,000.00 | $2,305.00 plus $3.50 per $1,000.00 value | ||
$1,000,001.00 and over | $4,055.00 plus $2.50 per $1,000.00 value | ||
Demolition | $26.50 | ||
Fence: | |||
Single-family residential | 13.50 | ||
Commercial | Based on value | ||
Inspection after regular hours (hourly) | $46.50, 2 hour minimum | ||
Mobile home installation | $13.50 | ||
Moving building | 26.50 | ||
Permit renewal | 1/2 of original fee, minimum $16.00 | ||
Plan review required by revisions (hourly) | $ 35.00 | ||
Reinspection | 45.00 | ||
Right-of-way1,2,3 | |||
Driveway: | |||
Residential (new or reconstructed) | 50.00 | ||
Residential (widening only) | 25.00 | ||
Commercial | 100.00 | ||
Excavation involving a street pavement cut: | |||
Street opening fee1: | |||
Patches less than 10 square yards | 25.00 | ||
Patches over 10 square yards but less than 25 square yards | 75.00 | ||
Patches over 25 square yards | 250.00 | ||
Linear borings or excavations: | |||
Up to 100 feet in length in right- of-way | 50.00 | ||
Each additional foot over 100 | 1.00 | ||
General excavation | 16.50 | ||
Grading: | |||
Less than 1 acre | 75.00 | ||
1 acre and above | 125.00 | ||
Sidewalk: | |||
100 square feet or less | 12.00 | ||
Each additional square foot over 100 | 0.10 | ||
Sign installation | Based on value | ||
Tank removal (each) | $26.50 | ||
Temporary sign: | |||
For 30 days | 13.50 | ||
For 60 days | 27.50 | ||
Temporary use | 13.50 | ||
Notes:
1. If an applicant proposes to excavate several locations under the same permit, the street opening fee shall be charged for each location.
2. Failure to obtain a permit prior to the commencement of work will result in a double fee and/or the issuance of a Municipal infraction citation unless the work is an emergency as determined by the chief building official.
3. Revenues for right-of-way permits will be deposited in a Community Improvement Program Fund used for right-of-way repair and restoration.
(Ord. 26-17, 8-1-2017)