(a) The permit to do any plumbing work shall be posted in a conspicuous place on the premises where the plumbing work is done.
(b) A permit shall not be issued for new or additional fixtures to an existing system of plumbing which is not constructed in compliance with this chapter, unless such changes are made as will render the system safe and sanitary to the satisfaction of the Safety-Service Director .
(c) No plumbing permit shall be issued unless the building, structure and premises are in compliance with the City’s minimum standard housing code, and all other City codes and regulations, unless such plumbing is part of a repair or remodeling program to bring the entire structure into compliance with City codes and regulations.
(Ord. 66(66-67). Passed 7-6-67.)
(d) Plumbing permits at the time of issuance must show on their faces the street number or lot number of the house or building where such plumbing is to be done and such permits may be used only at the house or building listed in the permits.
(e) After issuance of a plumbing permit, final inspection of plumbing by the plumbing inspector must be made no later than sixty days after completion of the building for which the permit was issued. Such final inspection must be made prior to the time the building is listed for sale.
(Ord. 49(70-71). Passed 8-5-71.)
(Ord. 49(70-71). Passed 8-5-71.)