1105.06 MATERIALS AND CONSTRUCTION PROCEDURE.
   (a)    Materials. Unless otherwise indicated on the plans, with advance approval of the City Engineer, materials shall meet the requirements and shall be in accordance with the "Material Details" of the current volume of the "Construction and Material Specifications", State of Ohio, Department of Highways. The materials shall be referred to by material grade or section number of the same current volume.
   (b)    Field Construction and Engineering. All items of work covered and stipulated in the construction plans, altered or extra work shall be performed in accordance with the lines, grades, typical cross sections and dimensions shown on the construction plans. All streets shall be graded the full width of the right of way. The setting and marking of all lines, profile and grade stakes necessary for the proper prosecution of the work in accordance with the construction plans shall be performed only by an authorized engineer or surveyor. Should any misunderstanding arise, as to intent or meaning of the construction plans, or any discrepancy appear in same, or in the proper method of setting and marking of the construction stakes, the decision of the City Engineer in such cases shall be final.
   (c)    Inspection. Inspection of the work shall be made by the City Engineer or his authorized representative. Forty-eight hours notice shall be required before any work or inspection takes place. Failure to comply with the above may result in the rejection of the work and the project. Failure to reject any defective work of materials shall not in any way prevent later rejection when such defects be discovered, or obligate the City to final acceptance.
   (d)    Acceptance of the Work. When the work has been completed, the City Engineer shall be notified. The improvement shall then be inspected by the City Engineer. If the work is found to be satisfactory, the City Engineer shall make such recommendation to Council for final acceptance of the improvement.
(Ord. 64(64-65). Passed 4-14-65.)