§ 152.026 POST-CONSTRUCTION CERTIFICATIONS REQUIRED.
   The following as-built certifications are required after a floodplain development permit has been issued:
   (A)   For new or substantially improved residential structures, or nonresidential structures that have been elevated, the applicant shall have a Federal Emergency Management Agency elevation certificate completed by a registered surveyor to record as-built elevation data. For elevated structures in Zone A and Zone AO areas without a base flood elevation, the elevation certificate may be completed by the property owner or owner’s representative; and
   (B)   For all development activities subject to the standards of § 152.030(A), a letter of map revision.
(Ord. 2011-114, passed 2-15-2011)