Editor's Note: Appendix A through Appendix H are available in PDF, click HERE
FEE $
1. Applicant's Name
Address
Phone #
2. Property Owner
Address
Phone #
3. Location of property
4. Zoning District
5. Applicant hereby applies for a zoning permit for the following use:
One-family dwelling unit Two-family dwelling unit
Multi-family dwelling unit – number of units
Accessory building (Describe)
Other residential use Business Industrial Other
Describe
6. Parcel Description
Frontage Depth Area X
7. Building Description
Width Depth
Number of stories Height
8. Setbacks
Left side Right side
Front Rear
Width at setback
9. Site Plan
An accurate diagram/blueprint must be attached showing the location of the building to be constructed, all existing buildings on the property with their dimensions, boundaries and division of property abutting streets and properties, and any greenbelt requirement landscaping.
10. Sewer System
Public or EPA approved Private
11. Paid
Cash Check
Date Receipt No.
Unless construction begins within six (6) months from date of issuance or is completed within eighteen (18) months, the Zoning Permit will be revoked.
NOTICE:
Applicant acknowledges that construction or use of this land is authorized only in accordance with the representations on this application and accompanying site plan and must conform with all provisions of the Bellville Zoning Ordinance. Separate permits may be needed from Richland County Codes and Permits Department, Richland County Health Department and the Village of Bellville Water Department.
Approval by the Zoning Inspector of this document shall constitute a zoning permit.
Date Applicant's Signature
Based upon the information contained in this application and the accompanying site plan, a zoning certificate is:
Approved Denied
Reason for denial
Date Zoning Inspector