§ 98.54 MINIMUM CITY TREE REMOVAL TECHNICAL SPECIFICATIONS.
   (A)   The tree trunk and all resulting wood chips shall be completely removed from the planting bed. All other debris shall be immediately removed and disposed of properly. Damage to adjacent sidewalk or curb areas shall be repaired or replaced as specified in §§ 97.36 through 97.38.
   (B)   The existing planting bed shall be filled with topsoil to a level equal to the top level of the adjacent sidewalk until such time as the planting bed is repaved as specified in §§ 97.36 through 97.38. No existing planting bed shall be left unpaved for a period of more than thirty (30) days from the date of the tree removal. The property owner shall underwrite the costs associated with the sidewalk replacement.
(Ord. 2003-07-02, passed 8-13-03)