§ 153.07 FEES FOR PERMITS.
   (A)   All fees shall be based upon and as set forth in § 150.38(M) of this chapter and on the accompanying table.
   (B)   Oil-burning devices shall use 140,000 BTU per gallon of fuel oil to determine input.
   (C)   The fee is applicable to each unit installed.
Schedule
Fees
Schedule
Fees
Input/BTU
   0 - 60,000
$10
   60,001 - 200,000
$15
   200,001 - 500,000
$20
   500,001 - 1,000,000
$30
   1,000,000 and over
$50
Solid fuel burning devices
$10
Gas logs and log starters
$5
Manufactured housing (per unit)
$20
*New residential construction less than 2,000 sq. ft.
$40
2,000 sq. ft. and greater
$60
NOTES TO TABLE:
*The flat fee is for all gas and solid fuel work and installation of equipment regardless of size, number of connections and the like. Additional inspections over the number as required to ensure compliance with pertinent codes shall be charged at a rate of $15 per inspection.
 
(1960 Code, § 27-1-7) (Ord. 5925, passed 10-19-1998)