§ 150.38 PERMIT TABLES.
   (A)   Building Permit Table No. 1.
COMBINATION PERMIT - SINGLE-FAMILY RESIDENTIAL
NEW CONSTRUCTION
(Includes new single-family homes or additions)
CALCULATION: Permit Fee = Gross Area x Gross Area Modifier x Type of Construction x Permit Fee Multiplier
EXAMPLE: 1,940 sq. ft. single-family residence with a 1,940 sq. ft. unfinished basement and a 400 sq. ft. attached garage
PERMIT INFORMATION:
Type of Construction
=
5B
Height
=
1 story
Area
=
1,940 sq. ft. with 400 sq. ft. attached garage
Basement
=
1,940 sq. ft. unfinished
Permit Fee Multiplier
=
0.0075
Use Group
=
R-3
FEE SPECIFICS
GROSS AREA:
Residential
=
1 story x 1,940 sq. ft.
Garage
=
400 sq. ft.
Unfinished Basement
=
1,940 sq. ft.
GROSS AREA MODIFIER:
 
=
61
TYPE OF CONSTRUCTION FACTOR USING TABLE:
Residential - R-3/5B
=
0.65
Garage
=
0.20
Unfinished Basement
=
0.20
PERMIT FEE:
Residence
=
1,940 sq. ft. x 61 x 0.65 x 0.00545185
=
$419.36
Garage
=
400 sq. ft. x 61 x .20 x 0.00545185
=
$26.61
Unfinished Basement
=
1,940 sq. ft. x 61 x .20 x 0.00545185
=
$129.03
TOTAL PERMIT FEE:
=
$575.00
STARTING WORK WITHOUT A PERMIT: DOUBLE THE FEE
 
 
   (B)   Building Permit Table No. 2.
COMBINATION PERMIT - TWO-FAMILY RESIDENTIAL
NEW CONSTRUCTION
(Includes new duplexes or additions)
 
CALCULATION: Permit Fee = Gross Area x Gross Area Modifier x Type of Construction x Permit Fee Multiplier
EXAMPLE: 2,357 sq. ft. single-story two-family residence with no basement and no garage
PERMIT INFORMATION:
Type of Construction
=
3B
Height
=
1 story
Area
=
2,357 sq. ft.
Permit Fee Multiplier
=
0.0075
Use Group
=
R-3
FEE SPECIFICS
GROSS AREA:
Residential
=
2,357 sq. ft.
GROSS AREA MODIFIER:
 
=
61
TYPE OF CONSTRUCTION FACTOR USING TABLE:
Residential - R-3/3B
=
0.75
PERMIT FEE:
Residence
=
2,357 sq. ft. x 61 x 0.75 x 0.0075
 
= $808.75
 
 
TOTAL PERMIT FEE:
=
$808.75
STARTING WORK WITHOUT A PERMIT: DOUBLE THE FEE
 
 
   (C)   Building Permit Table No. 3.
COMBINATION PERMIT - MULTI-FAMILY RESIDENTIAL
NEW CONSTRUCTION
(Includes new multi-family buildings or additions to existing)
 
CALCULATION: Permit Fee = Gross Area x Gross Area Modifier x Type of Construction x Permit Fee Multiplier
EXAMPLE: Two-story 12 family apartment building. Total square footage - 14,000.
PERMIT INFORMATION:
Type of Construction
=
3B
Height
=
2 stories
Area
=
1st story - 7,000 sq. ft.
 
2nd story - 7,000 sq. ft.
Permit Fee Multiplier
=
0.0075
Use Group
=
R-2
FEE SPECIFICS
GROSS AREA:
Building
=
2 stories x 7,000 sq. ft.
GROSS AREA MODIFIER:
 
=
61
TYPE OF CONSTRUCTION FACTOR USING TABLE:
Residential - R-2/3B
=
0.75
PERMIT FEE:
Building
=
14,000 sq. ft. x 61 x 0.75 x 0.0075
=
$4,803.75
TOTAL PERMIT FEE:
 
=
$4,803.75
STARTING WORK WITHOUT A PERMIT: DOUBLE THE FEE
 
 
   (D)   Building Permit Table No. 4.
COMBINATION PERMIT - COMMERCIAL BUILDING PERMIT
NEW CONSTRUCTION
(Includes new commercial buildings or additions)
 
CALCULATION: Permit Fee = Gross Area x Gross Area Modifier x Type of Construction x Permit Fee Multiplier
EXAMPLE: 9,900 sq. ft. one story commercial building
PERMIT INFORMATION:
Type of Construction
=
3B
Height
=
1 story
Area
=
9,900 sq. ft.
Permit Fee Multiplier
=
0.0075
Use Group
=
B
FEE SPECIFICS
GROSS AREA:
Building
=
9,900 sq. ft.
GROSS AREA MODIFIER:
 
=
61
TYPE OF CONSTRUCTION FACTOR USING TABLE:
Residential - B3/B
=
0.91
PERMIT FEE:
Building
=
9,900 sq. ft. x 61 x 0.91 x 0.0075
=
$4,121.62
TOTAL PERMIT FEE:
=
$4,121.62
STARTING WORK WITHOUT A PERMIT: DOUBLE THE FEE
 
 
   (E)   Building Permit Table No. 5.
COMBINATION PERMIT - TENANT FINISH COMMERCIAL
(Includes all tenant finishes for commercial use)
 
CALCULATION: Permit Fee = Gross Area x Gross Area Modifier x Type of Construction x Permit Fee Multiplier
EXAMPLE: 3,480 sq. ft. tenant finish
PERMIT INFORMATION:
Type of Construction
=
3B
Area
=
3,480 sq. ft.
Permit Fee Multiplier
=
0.0098
FEE SPECIFICS
 
 
 
GROSS AREA:
Building
=
3,480 sq. ft.
ADJUSTED GROSS AREA MODIFIER:
 
=
31
TYPE OF CONSTRUCTION FACTOR USING TABLE:
Residential - B3/B
=
0.91
PERMIT FEE:
Building
=
3,480 sq. ft. x 31 x 0.91 x 0.0098
 
=
$962.07
TOTAL PERMIT FEE:
 
=
$962.07
STARTING WORK WITHOUT A PERMIT: DOUBLE THE FEE
 
 
   (F)   Building Permit Table No. 6.
COMBINATION PERMIT - RESIDENTIAL REHAB
(Includes all residential rehabs)
 
CALCULATION: Permit Fee = Gross Area x Gross Area Modifier x Type of Construction x Permit Fee Multiplier
EXAMPLE: 1,660 sq. ft. residential rehab
PERMIT INFORMATION:
Type of Construction
=
5B
Area
=
1,660 sq. ft.
Permit Fee Multiplier
=
0.0098
FEE SPECIFICS
GROSS AREA:
Residential
=
1,660 sq. ft.
ADJUSTED GROSS AREA MODIFIER:
 
=
31
TYPE OF CONSTRUCTION FACTOR USING TABLE:
Residential - R-3/5B
=
0.65
PERMIT FEE:
Residence
=
1,660 sq. ft. x 31 x 0.65 x 0.0098
 
= $327.80
TOTAL PERMIT FEE:
 
=
$327.80
STARTING WORK WITHOUT A PERMIT: DOUBLE THE FEE
 
 
   (G)   Building Permit Table No. 7.
COMBINATION PERMIT - MANUFACTURED HOMES
(Includes all manufactured and mobile homes)
 
TOTAL PERMIT FEE:
=
$150
 
Based on:
$35
Plumbing
$30
Gas
$60
Electric
$25
Building
TOTAL FEES:
$150
 
STARTING WORK WITHOUT A PERMIT: DOUBLE THE FEE
 
 
   (H)   Building Permit Table No. 8.
INDIVIDUAL PERMIT - BUILDING - RESIDENTIAL
(Includes sheds, windows, doors, roof sheathing)
 
MINIMUM PERMIT: Residential: = $45.00
CALCULATION: Permit Fee = Gross Area x Gross Area Modifier x Type of Construction x Permit Fee Multiplier
EXAMPLE: 20 x 24' detached garage (Residential)
PERMIT INFORMATION:
Type of Construction
=
N/A
 
Height
=
1 story
 
Area
=
480 sq. ft.
 
Permit Fee Multiplier
=
0.0075
 
Use Group
=
R-3
 
FEE SPECIFICS
GROSS AREA:
Residential
=
480 sq. ft.
 
GROSS AREA MODIFIER:
=
61
 
TYPE OF CONSTRUCTION FACTOR USING TABLE:
=
.20
 
PERMIT FEE:
=
480 sq. ft. x 61 x 0.20 x 0.0075
 
=
$43.92
 
TOTAL PERMIT FEE:
 
=
$43.92
 
(Please note: Since this fee dopes not meet the minimum permit fee, $45.00 would be charged.)
STARTING WORK WITHOUT A PERMIT: DOUBLE THE FEE
 
 
   (I)   Building Permit Table No. 9.
INDIVIDUAL PERMIT - BUILDING - COMMERCIAL
(Includes sheds, windows, doors, siding, roof sheathing)
 
MINIMUM PERMIT: Commercial: = $75.00
CALCULATION: Permit Fee = Gross Area x Gross Area Modifier x Type of Construction x Permit Fee Multiplier
EXAMPLE:800 sq. ft. storage building (Commercial)
PERMIT INFORMATION:
Type of Construction
=
5B
Height
=
1 story
Area
=
800 sq. ft.
Permit Fee Multiplier
=
0.0098
Use Group
=
S-2
FEE SPECIFICS
GROSS AREA:
Building
=
800 sq. ft.
GROSS AREA MODIFIER:
=
61
TYPE OF CONSTRUCTION FACTOR USING TABLE:
=
.37
PERMIT FEE:
=
800 sq. ft. x 61 x 0.37 x 0.0075
=
$135.42
TOTAL PERMIT FEE:
=
$135.42
STARTING WORK WITHOUT A PERMIT: DOUBLE THE FEE
 
 
   (J)   Building Permit Table No. 10.
 
 
INDIVIDUAL PERMIT - DEMOLITION
RESIDENTIAL/COMMERCIAL
 
PERMIT FEE: = $50
Requires a demolition bond on file with the City of Belleville in the amount to be determined by the City of Belleville Building and Zoning Commissioner. Bond required can be anywhere between $1,000.00 - $5,000.00.
 
STARTING WORK WITHOUT A PERMIT: DOUBLE THE FEE
 
 
   (K)   Building Permit Table No. 11.
 
INDIVIDUAL PERMIT - DUMPSTER
DUMPSTER/STORAGE POD PERMIT ON STREET: = $50 for 30 days
All debris and stored items must be kept inside dumpster or storage pod. Department will notify Police Department of current permits.
PLACING DUMPSTER OR STORAGE POD WITHOUT A PERMIT: DOUBLE THE FEE
 
   (L)   Electric Permit Table.
INDIVIDUAL PERMIT - ELECTRIC
(Used for upgrading services and wiring)
Fee schedule based upon service size, plus additional electrical work to be performed
   Residential Service - $75
   Commercial Service - $75
   Residential Code Correction Repairs - $75
Energy management system installations = $100
Service station pumps - $10 per pump
Electrical appliance permit - $10 per appliance - water heater and furnace
Illuminated signs - $25 per sign
Letters of certification - $75, plus $5 for each 1,000 sq. ft. of area certified or fraction thereof
Elevator fee - $50 (electrical permit for installation)
Inspections are done by the company performing the installation
Minor electrical work in addition to a service upgrade - $15
Minimum fee for any permit - $15
Examination registration fee- $25
License fee - $50 annually
After May 1, and up to 60 days, renewal fee shall be $100 after which the electrical contractor must complete process for new applicant
Bond requirement - $10,000
 
WORK STARTED WITHOUT APPLYING FOR A PERMIT: DOUBLE THE FEE
 
 
   (M)   Plumbing Permit Table No. 1.
 
 
INDIVIDUAL PERMIT - PLUMBING
(Used for individual fixture additions or replacements)
 
FIXTURE: $8 each
REQUESTED INSPECTIONS: $50 per trip
MORE THAN 3 TRIPS ON A PERMIT: $50 per trip
 
WORK STARTED WITHOUT APPLYING FOR A PERMIT: DOUBLE THE FEE
 
 
   (N)   HVAC Permit Table No. 1.
FEE PROPOSAL
INDIVIDUAL PERMIT - HVAC
(Used for individual addition or replacement of gas fired appliances)
FEE IS APPLICATION TO EACH UNIT INSTALLED
      SCHEDULE:
 
INPUT/BTU
FEES
 
0-200,000
$15.00
 
200,001-500,000
$20.00
 
500,001-1,000,000
$30.00
 
1,000,001 and over
$50.00
 
Solid Fuel Burning Devices
$15.00
 
Gas Logs and Log Starters
$15.00
 
Additional Inspections over the number is required to ensure compliance with pertinent codes
$50.00
 
Replacement of a gas appliance in a single-family
$10.00 per appliance
 
Family residence
 
 
Appliances to include:
Water Heater
 
 
Furnace
 
 
Boiler
 
 
Gas Logs and Log Lighter
 
 
Solid Fuel Devices
 
 
Wood Furnaces
 
 
Fireplaces
WORK STARTED BEFORE APPLYING FOR A PERMIT: DOUBLE THE FEE
 
   (O)   Residential Solar Energy Systems Permit Table 1.
 
Residential Solar Energy Systems
Permit Fee
Construction cost $10,000 or less
$200
Construction cost over $10,000 up to $50,000
$250
Construction cost over $50,000
$300
The standard permit fee, plan review fee, energy conservation plan review and inspection fee are all included in the aforementioned fees. Fees for any "additional inspection" required including inspections for compliance with approved development or site plans or fees for any "additional inspection" that may be required are not shown here and shall be added to the total payment fee.
$75 per inspection
 
   (P)   Commercial and Industrial Solar Energy Systems Permit Table 1.
Commercial and Industrial Permit Fee Schedule
Cost Thousand
Fee Amount
Cost Thousand
Fee Amount
Cost Thousand
Fee Amount
Cost Thousand
Fee Amount
Cost Thousand
Fee Amount
Commercial and Industrial Permit Fee Schedule
Cost Thousand
Fee Amount
Cost Thousand
Fee Amount
Cost Thousand
Fee Amount
Cost Thousand
Fee Amount
Cost Thousand
Fee Amount
Up to 1
$104.68
Up to 30
$423.56
Up to 78
$814.92
Up to 190
$1,728.08
Up to 540
$4,222.76
Up to 2
$143.34
Up to 31
$439.67
Up to 80
$831.02
Up to 195
$1,760.29
Up to 560
$4,351.60
Up to 3
$169.10
Up to 32
$439.67
Up to 82
$848.74
Up to 200
$1,792.50
Up to 580
$4,483.66
Up to 4
$196.48
Up to 33
$439.67
Up to 84
$864.84
Up to 210
$1,874.63
Up to 600
$4,610.89
Up to 5
$244.80
Up to 34
$455.77
Up to 86
$879.34
Up to 220
$1,955.16
Up to 620
$4,742.95
Up to 6
$278.62
Up to 35
$455.77
Up to 88
$897.05
Up to 230
$2,030.85
Up to 640
$4,875.01
Up to 7
$293.11
Up to 36
$471.88
Up to 90
$929.26
Up to 240
$2,103.33
Up to 660
$5,003.85
Up to 8
$325.32
Up to 37
$473.49
Up to 92
$945.37
Up to 250
$2,183.85
Up to 680
$5,134.31
Up to 9
$339.82
Up to 38
$489.60
Up to 94
$963.08
Up to 260
$2,248.27
Up to 700
$5,266.37
Up to 10
$343.04
Up to 39
$491.21
Up to 96
$977.58
Up to 270
$2,332.02
Up to 720
$5,395.21
Up to 11
$343.04
Up to 40
$505.70
Up to 98
$995.30
Up to 280
$2,332.02
Up to 740
$5,525.66
Up to 12
$343.04
Up to 42
$521.81
Up to 100
$1,009.79
Up to 290
$2,478.57
Up to 760
$5,656.11
Up to 13
$343.04
Up to 44
$537.91
Up to 105
$1,043.61
Up to 300
$2,541.38
Up to 780
$5,786.56
Up to 14
$343.04
Up to 46
$552.40
Up to 110
$1,091.93
Up to 310
$2,571.98
Up to 800
$5,918.62
Up to 15
$343.04
Up to 48
$571.73
Up to 115
$1,122.53
Up to 320
$2,691.16
Up to 820
$6,047.47
Up to 16
$344.65
Up to 50
$586.23
Up to 120
$1,174.06
Up to 330
$2,752.36
Up to 840
$6,160.20
Up to 17
$357.53
Up to 52
$603.94
Up to 125
$1,204.66
Up to 340
$2,834.50
Up to 860
$6,290.65
Up to 18
$357.53
Up to 54
$634.54
Up to 130
$1,256.20
Up to 350
$2,900.53
Up to 880
$6,421.10
Up to 19
$376.86
Up to 56
$636.15
Up to 135
$1,288.41
Up to 360
$2,981.05
Up to 900
$6,551.55
Up to 20
$376.86
Up to 58
$650.65
Up to 140
$1,336.72
Up to 370
$3,048.70
Up to 920
$6,665.90
Up to 21
$376.86
Up to 60
$669.97
Up to 145
$1,368.93
Up to 380
$3,111.51
Up to 940
$6,796.35
Up to 22
$378.47
Up to 62
$684.47
Up to 150
$1,417.25
Up to 390
$3,193.64
Up to 960
$6,925.19
Up to 23
$376.86
Up to 64
$702.18
Up to 155
$1,451.07
Up to 400
$3,259.67
Up to 980
$7,041.15
Up to 24
$391.35
Up to 66
$716.68
Up to 160
$1,483.28
Up to 420
$3,390.12
 
 
Up to 25
$391.35
Up to 68
$734.39
Up to 165
$1,531.60
Up to 440
$3,536.68
 
 
Up to 26
$409.07
Up to 70
$750.50
Up to 170
$1,563.81
Up to 460
$3,668.74
 
 
Up to 27
$409.07
Up to 72
$766.60
Up to 175
$1,615.34
Up to 480
$3,813.69
 
 
Up to 28
$423.56
Up to 74
$782.71
Up to 180
$1,647.55
Up to 500
$3,944.14
 
 
Up to 29
$423.56
Up to 76
$798.81
Up to 185
$1,679.76
Up to 520
$4,074.59
 
 
 
Commercial and Industrial Permit Fee Schedule
Cost Millions
Fee Amount
Cost Millions
Fee Amount
Cost Millions
Fee Amount
Cost Millions
Fee Amount
Cost Millions
Fee Amount
Commercial and Industrial Permit Fee Schedule
Cost Millions
Fee Amount
Cost Millions
Fee Amount
Cost Millions
Fee Amount
Cost Millions
Fee Amount
Cost Millions
Fee Amount
Up to 1.1
$7,756.22
Up to 3.7
$22,067.21
Up to 8.6
$45,709.49
Up to 19.5
$96,086.25
Up to 32.5
$159,582.21
Up to 1.2
$8,355.33
Up to 3.8
$22,587.40
Up to 8.8
$46,617.82
Up to 20.0
$98,382.83
Up to 33.0
$162,036.63
Up to 1.3
$8,957.66
Up to 3.9
$23,091.49
Up to 9.0
$47,526.15
Up to 20.5
$100,845.30
Up to 33.5
$164,491.05
Up to 1.4
$9,540.66
Up to 4.0
$23,610.08
Up to 9.2
$48,436.09
Up to 21.0
$103,301.33
Up to 34.0
$166,945.47
Up to 1.5
$10,125.28
Up to 4.2
$24,615.03
Up to 9.4
$49,344.42
Up to 21.5
$105,763.80
Up to 34.5
$166,945.47
Up to 1.6
$10,708.28
Up to 4.4
$25,636.10
Up to 9.6
$50,252.74
Up to 22.0
$108,218.22
Up to 40.0
$196,068.32
Up to 1.7
$11,278.40
Up to 4.6
$26,628.17
Up to 9.8
$51,161.07
Up to 22.5
$110,680.69
Up to 40.5
$198,522.74
Up to 1.8
$11,845.30
Up to 4.8
$27,634.74
Up to 10.0
$52,053.29
Up to 23.0
$113,135.11
Up to 41.0
$200,969.10
Up to 1.9
$12,413.81
Up to 5.0
$28,530.82
Up to 10.5
$54,291.90
Up to 23.5
$115,599.19
Up to 41.5
$203,423.52
Up to 2.0
$12,980.71
Up to 5.2
$29,614.06
Up to 11.0
$56,516.02
Up to 24.0
$118,053.60
Up to 42.0
$205,869.88
Up to 2.1
$13,531.51
Up to 5.4
$30,586.81
Up to 11.5
$58,722.42
Up to 24.5
$120,516.07
Up to 42.5
$208,324.30
Up to 2.2
$14,083.91
Up to 5.6
$31,561.16
Up to 12.0
$60,928.81
Up to 25.0
$122,970.49
Up to 43.0
$210,770.66
Up to 2.3
$14,636.31
Up to 5.8
$32,533.91
Up to 12.5
$63,103.00
Up to 25.5
$125,434.57
Up to 43.5
$213,225.08
Up to 2.4
$15,187.11
Up to 6.0
$33,490.56
Up to 13.0
$65,278.80
Up to 26.0
$127,888.99
Up to 44.0
$215,671.45
Up to 2.5
$15,739.51
Up to 6.2
$34,463.30
Up to 13.5
$67,433.66
Up to 26.5
$130,351.46
Up to 44.5
$218,125.86
Up to 2.6
$16,275.81
Up to 6.4
$35,423.17
Up to 14.0
$69,593.36
Up to 27.0
$132,805.88
Up to 45.0
$220,572.23
Up to 2.7
$16,808.89
Up to 6.6
$36,345.99
Up to 14.5
$71,735.34
Up to 27.5
$135,268.35
Up to 45.5
$223,028.26
Up to 2.8
$17,343.58
Up to 6.8
$37,318.74
Up to 15.0
$73,861.21
Up to 28.0
$137,722.76
Up to 46.0
$225,473.01
Up to 2.9
$17,881.49
Up to 7.0
$38,260.89
Up to 15.5
$76,383.27
Up to 28.5
$140,186.84
Up to 46.5
$227,929.04
Up to 3.0
$18,417.79
Up to 7.2
$39,201.42
Up to 16.0
$78,845.74
Up to 29.0
$142,641.26
Up to 47.0
$230,375.40
Up to 3.1
$18,954.09
Up to 7.4
$40,141.96
Up to 16.5
$81,308.21
Up to 29.5
$145,103.73
Up to 47.5
$232,829.82
Up to 3.2
$19,471.07
Up to 7.6
$41,084.11
Up to 17.0
$83,772.29
Up to 30.0
$147,308.52
Up to 48.0
$235,276.18
Up to 3.3
$19,991.26
Up to 7.8
$42,008.54
Up to 17.5
$86,234.76
Up to 30.5
$149,762.94
Up to 48.5
$237,730.60
Up to 3.4
$20,527.56
Up to 8.0
$42,934.59
Up to 18.0
$88,697.23
Up to 31.0
$152,218.96
Up to 49.0
$240,176.97
Up to 3.5
$20,997.83
Up to 8.2
$43,860.63
Up to 18.5
$91,161.31
Up to 31.5
$154,673.38
Up to 49.5
$242,631.38
Up to 3.6
$21,555.07
Up to 8.4
$44,783.45
Up to 19.0
$93,623.78
Up to 32.0
$157,127.80
Up to 50.0
$244,660.63
 
(1960 Code, Permit Tables) (Ord. 6670, passed 8-2-2004; Ord. 7831, passed 12-16-2014; Ord. 8313-2019, passed 3-18-2019; Ord. 8411-2020, passed 1-21-2020; Ord. 9044-2022, passed 5-2-2022; Ord. 9131-2023, passed 3-6-2023)