(A) The office of the Electrical Inspector shall collect all fees in advance and shall turn all fees over to the City Treasurer.
(B) Fees for electrical permits shall be based upon and as set forth on the accompanying fee schedule. In cases where any work for which an electrical permit is required has been started without the issuance of the necessary permit, the total fees as required for the permit shall be doubled. Permit fees are to be paid before the electrical permit shall be issued.
(1960 Code, § 24-1-13) (Ord. 8412-2020, passed 1-21-2020)