§ 51.004 NEW LINES; NOTICE TO CONNECT.
   Whenever new water or sewer lines are installed and are ready for use, the town shall notify the owner of any occupied structure located within 200 feet of the new water or sewer line to connect his or her structure to the new line(s) within 60 days after date of the notice.
(1989 Code, Title III, Ch. 30, § 1-4) (Ord. passed 7-10-1990; Ord. passed 2-10-2009)