§ 51.101 SURVEILLANCE SCHEDULE.
   (A)   To establish a feasible surveillance schedule, the following classes of major contributors are formed.
 
Class
Qualifications
Surveillance Schedule
A
Flow of 100,000 gallons per day (0.l MGD) and greater per average workday
Quarterly
B
Flow from 0.05 MGD to 0.l MGD per average workday, or discharge with constituents or characteristics that result in a major contributor classification
Semi- annually
 
   (B)   The surveillance period will normally be for a period of seven consecutive days, but can be of longer or shorter duration at the discretion of the Board of Public Works and Safety or the Sewer Superintendent. In cases where the surveillance period extends for a greater number of consecutive days than seven, the city shall have the prerogative of selecting the seven consecutive days of its choice for establishing rates and charges as provided for in this subchapter.
   (C)   The charge for each surveillance survey shall be $20 per day with a maximum charge for seven days of $140.
(Ord. 10-1978, passed 7-11-78)