1440.08 PERMIT RESTRICTIONS.
   (a)   Moving.
      (1)   All moving of buildings or structures shall be fully completed within thirty days from the date of issuance of a permit therefor.
      (2)   The premises from which the building or structure is moved shall be cleared of all debris, filled and leveled within seven days, in accordance with accepted standards, except where the excavation is needed or desired for new construction on the premises and a building permit therefor has been issued.
      (3)   An adequate fence or barricade shall be erected completely around open basements or cellars on the same day that the building or structure is moved off the foundation walls and shall be maintained until the filling and leveling off has been completed or new construction has been started.
      (4)   If, in the moving of a building or structure, it becomes necessary to leave the building or structure setting on the streets or other public thoroughfares after sundown, the contractor shall be responsible for the adequate lighting of the building or structure and all equipment used in connection with the moving process, from sundown to sunrise.
   (b)   Wrecking.
      (1)   All work covered by the wrecking permit shall be fully completed within forty-five calendar days from the date of issue unless excepted in the following manner:
         A.   Upon the receipt of a written request, not later than five days prior to the expiration date noted on the approved application, the Superintendent of Building Inspection may grant a maximum of fifteen days extension of time to complete the wrecking and clean-up of the site if, in his opinion, the size and type of structure or extremely inclement weather conditions warrant additional time.
         B.   A request for further extension of time shall be acted upon by the Building Code Board of Appeals upon submission of a written request seven days prior to the expiration of the time extension granted by the Superintendent of Building Inspection.
         C.   A fee equal to the original fee shall be assessed to the person securing the original permit when wrecking exceeds sixty days, unless such fee is waived by the Building Code Board of Appeals.
      (2)   Material may be sold from the premises only during the wrecking period. No materials shall be brought in for sale. Material shall not be sold or stored on the curb, lawn or other public property or property generally used by the public.
      (3)   The premises from which a building or structure is wrecked shall be cleared of all debris, filled and leveled to accepted standards within ten days of the final wrecking, except where excavation is needed or desired for new construction on the premises and a building permit therefor has been applied for or issued.
      (4)   An adequate fence or barricade shall be erected completely around open basements or cellars prior to the removal of the first floor construction and shall be maintained until the filling and leveling off has been completed or new construction has been started.
(1975 Code Sec. 8.337)