1040.33 CONNECTION FEES.
   (a)   Connection Fee. A connection fee schedule shall be established from time to time by resolution of the City Commission.
   (b)   Premises Not Connected to Water System. The connection fee or connection tap fee may be determined for premises not connected to the City water system in a manner similar to that set forth in this section if an approved wastewater meter is installed in the sewage discharge line and is read by the City Water Department in accordance with their meter reading schedule. A connection fee will be charged for each 1,000 cubic feet of wastewater discharged per month, based on a twenty-four month average, as described in this section.
   (c)   Installment Payments. Any connection tap fee or connection charge permitted to be paid in installments may be paid in accordance with the following:
      (1)   Application. Application for an installment payment may be made to the City Treasurer.
      (2)   Installments. The fee or charge may be made in not more than ten annual installments, bearing interest on the unpaid installment at the rate of six percent per annum to accrue from the date of billing by the City.
(Ord. 14-01. Passed 10-16-01.)