(A) The holder of any permit issued which grants permission to cut, dig, trench, grade, excavate, tunnel or bore, in or under any road, street, alley, sidewalk, roadside ditch, right-of-way or other public place as provided in this subchapter shall complete all work including pavement repairs within 14 days after beginning work at each location.
(B) (1) During the period from November 15 through March 15 of each year, if weather conditions do not allow permanent repairs to be completed, the permittee shall make temporary pavement repairs within the 14-day period described in division (A) above.
(2) The temporary repairs shall be made with asphalt cold mix and shall be maintained by the permittee until permanent repairs can be made.
(3) Permanent repairs shall be completed prior to the following April 15.
(Prior Code, § 5-186) (Ord. 1991-06, passed 5-6-1991)