§ 151.039 PERMIT EXTENSIONS.
   The holder of any permit issued which grants permission to cut, dig, trench, grade, excavate, tunnel or bore, in or under any road, street, alley, sidewalk, roadside ditch, right-of-way or other public place, as provided by this subchapter, shall complete the work and repair the place or places where the work is done within 90 days from the issuance of such permit. The County Highway Engineer or the Engineer’s assistant, however, may extend the time for the completion of the work for which the permit was granted.
(Ord. 2021-02, passed 3-8-2021)