Grading of building sites, and excavation of the placement of fill, shall conform to the requirements of Chapter 70 of the Uniform Building Code, hereby adopted by reference, and to the following standards, unless physical conditions demonstrate the propriety of other standards or methods of grading, including but not limited to, retaining walls, stabilized slopes, and vegetative cover:
(A) Finish and fill cut slopes shall not exceed 1 foot vertically to 2 feet horizontally; and
(B) The character of soil for fill and the characteristics of lots and parcels made usable by fill shall be suitable for the purpose intended.
(Ord. 2021-08-02, passed 10-12-2021) Penalty, see § 152.999