Upon receipt of the permit for the Landscape Documentation Package and completion of the landscaping and irrigation system, the developer shall submit a Certificate of Completion, as provided in the Landscape Design Manual, to the Director of Community Development for review. The following details apply to the Certificate of Completion:
(A) Standard form. The Certificate of Completion shall be on a standard form approved by the Director of Community Development.
(B) Compliance statement. The Certificate of Completion shall include a statement that the landscaping and irrigation system have been installed in substantial compliance with the approved Landscape Documentation Package. It shall acknowledge the evaluation of the landscape and irrigation system by a California licensed landscape architect, landscape contractor or other individual deemed qualified by the Director of Community Development.
(1) Where there have been significant changes made in the field during construction, these 'as-built' or record drawings shall be included with the certification;
(2) SA diagram of the irrigation plan showing hydrozones shall be kept with the irrigation controller for subsequent management purposes.
(C) Irrigation scheduling parameters. The Certificate of Completion shall include the irrigation scheduling parameters used to set the controller pursuant to § 153.160.150.
(D) Landscape and irrigation maintenance schedule. The Certificate of Completion shall include a landscape and irrigation maintenance schedule pursuant to § 153.160.160.
(E) Irrigation audit report. The Certificate of Completion shall include an irrigation audit report pursuant to § 153.160.170.
(F) Soils analysis report. The Certificate of Completion shall include a soils analysis report if not previously submitted with the Landscape Documentation Package pursuant to § 153.160.120.
(G) Submit Certificate of Completion to Director. The developer shall submit the Certificate of Completion to the Director of Community Development prior to the issuance of occupancy permits.
(H) Submit Certificate of Completion to purveyor and owner. The developer shall submit approved copies of the Certificate of Completion to the local water purveyor and property owner or his or her designee.
(Ord. 1346, passed 5-2-12; Am. Ord. 1379, passed 11-4-15)