§ 4.85 STORM WATER POLLUTION PREVENTION PLAN (SWPPP).
   The Storm Water Pollution Prevention Plan shall include the following:
   Subd. 1.   A natural resources map identifying soils, forest cover, and water resources located on or near the site;
   Subd. 2.   A sequence of construction of the development site, including stripping and clearing; rough grading; construction of utilities, infrastructures, and buildings; and final grading and landscaping. Sequencing shall identify the expected date on which clearing will begin, the estimated duration of exposure of cleared areas, areas of clearing, installation of temporary erosion and sediment control measures, and establishment of permanent vegetation;
   Subd. 3.   All erosion and sediment control measures necessary to meet the objectives of this local regulation throughout all phases of construction and after completion of development of the site. Depending upon the complexity of the project, the drafting of intermediate plans may be required at the close of each season;
   Subd. 4.   Seeding mixtures and rates, types of sod, method of seedbed preparation, expected seeding dates, type and rate of lime and fertilizer application, and kind and quantity of mulching for both temporary and permanent vegetative control measures;
   Subd. 5.   Waste controls for any type of waste which may be generated on the site. Waste controls must provide for appropriate waste storage on-site and property disposal;
   Subd. 6.   Provisions for maintenance of control of facilities, including easements and estimates of the cost of maintenance;
   Subd. 7.   A statement indicating the party responsible for the long-term storm water management for the development and the party responsible for any permanent storm water management systems on site; and
   Subd. 8.   Modifications to the plan shall be processed and approved or disapproved in the same manner as § 4.84 of this regulation, may be authorized by the city by written authorization to the permittee, and shall include:
      A.   Major amendments of the SWPPP submitted to Inspection Department;
      B.   Field modifications of a minor nature.
(Ord. 553, passed 8-6-07)