1165.04 APPLICATION AND SITE PLAN REQUIREMENTS.
   Applicants for telecommunications towers shall complete an application for Conditional Zoning Certificate along with an Application to Appear to enable the Planning Commission to review the proposed site. The following information shall accompany the application for Conditional Zoning Certificate:
   (a)   A site development plan showing proposed tower and all appurtenant structure(s) location, distances to all property lines, streets (as measured from right-of-way line), existing and proposed easements, driveway location, and parking spaces.
   (b)   A current certified survey of the property.
   (c)   A statement from the applicant that it has inventoried all structures in the vicinity of the proposed site capable of supporting the proposed antenna to ascertain the inability to utilize said structures for the proposed facility (collocation).
   (d)   A listing of existing zoning and land uses on the proposed site and adjacent properties.
   (e)   An inventory of existing towers, antennas or sites approved for same that are located either within the City or within its search area thereof, including specific information regarding the location, height, and design of each tower.
   (f)   A landscaping plan which includes a specific list of proposed planting materials and provides the following minimum requirements:
(1)   Tower facilities shall be landscaped with a buffer of plant materials that effectively screen the view of the tower compound and is satisfactory to the City Arborist.
(2)   The standard buffer shall consist of a landscaped strip at least four feet (4') wide outside the perimeter of the compound.
   (g)   Evidence supporting compliance with current FCC standards for EMR emissions.
   (h)   A statement regarding lighting requirements as mandated by the FAA.
      (Ord. 2000-143. Passed 6-26-00.)