1327.08 TESTS AND INSPECTIONS.
   (a)    The following tests and inspections shall be required of all plumbing permit holders:
      (1)    One roughing-in test and inspection which may consist of two partial roughing-in tests and inspections.
      (2)    One final test and inspection.
   
   (b)    One final inspection will be required of all holders of permits for replacement of fixtures or water heating equipment.
   (c)    Tests and inspections in addition to the above may be conducted upon payment of the reinspection fee outlined in Section 1327.07. The equipment, material and labor necessary for tests or inspections shall be furnished by the permit holder and he shall be present during tests or inspections. (Ord. 8-76. Passed 3-2-76.)