9-16-3: ON SITE UTILITY AND DEVELOPMENT REQUIREMENTS:
All manufactured homes, whether titled or untitled, are subject to this chapter and shall, prior to occupancy, be inspected by an authorized official, and issued a certificate of occupancy. Approved on site utilities, to include water, sewer, and electricity, are prerequisite to issuance of a manufactured home placement permit (MHPP).
   A.   All electrical, plumbing, and gas hookups from structure to public tie ins shall be inspected and approved by an inspector of the New Mexico manufactured housing division (NMMHD) or construction industries division (CID), as the case may be, prior to occupancy. All water, sewer and electrical public tie ins shall be permitted and inspected by the city of Artesia's building inspection division before a certificate of occupancy shall be issued by the code enforcement officer.
   B.   Any water, sewer, electric, or natural gas utility provider that connects services to individual parcels before the landowner holds a valid MHPP is in violation of this chapter and the service shall be disconnected.
   C.   There shall be no multiple users connected to a domestic water well nor to any on site liquid waste disposal system except for properly permitted systems through New Mexico environmental protection agency (NMEPA). (Ord. 969, 6-9-2015)