§ 156.125  TEMPORARY USE/STRUCTURE STANDARDS (TU).
   (A)   TU-01: temporary uses or structures that abide by all applicable development standards for the subject zoning district are permitted. The following standards also pertain to temporary uses/structures.
      (1)   Transition to permanent or accessory uses/structures. Any temporary use or structure that is intended to transition into a permanent use/structure or accessory structure must meet all standards for a permanent use/structure or accessory structure. In the event the intent is not noted upon the application, the transition to a permanent use/structure or accessory structure will not be permitted for one year from the application date.
      (2)   Duration. All temporary uses/structures shall be permitted for the period of up to six months, unless otherwise noted in this chapter.
      (3)   Permit. All temporary uses/structures will be required to have a temporary improvement location permit and will be subject to fees as adopted, unless otherwise noted in this subchapter.
      (4)   Cessation of use. All temporary uses/structures must, upon cessation, remove all structures, elements and debris; and revert all alterations to the original site to its original state. All removal and alterations must take place within the permitted duration.
      (5)   Limit. A petitioner shall be limited to a total of one temporary uses/structures per year.
   (B)   TU-02: temporary uses permitted include:
      (1)   Garage sales (no permit necessary):
         (a)   Garage sales are permitted a maximum of three times per year, per property; and
         (b)   Maximum duration (time limit) for a sale shall be two days.
      (2)   Children’s roadside stand (no permit necessary); and
      (3)   Tents for a private party/event (no permit necessary).
   (C)   TU-03: temporary structures/uses permitted include:
      (1)   Construction trailers (permit may be renewed one time by the Zoning Administrator with reason;
      (2)   Roadside sales vehicles or structures; and
      (3)   Tents for sales and business events. Maximum duration (time limit) is 15 days with permit.
(Ord. 2002-05, passed 12-30-2002, § 7.6)