§ 150.01  PLAN COMMISSION FEES; PERMITS.
   (A)   The following schedule of fees, charges and expenses are hereby adopted for the jurisdictional area of the Advisory Plan Commission of the town.
      (1)   Application for building permit.
         (a)   Residential.
Addition to existing building porch or deck
   144 sq. ft. or less
$50 (fee and inspection)
   Larger than 144 sq. ft.
$50 + 0.05/sq. ft. + 50 I
Certificate of occupancy
   Accessory structure
$25
   Principle structure
$50
Demolition
   Principle structure
$200 + 50 I
   Accessory structure
$50 + 25 I
Detached garage/accessory buildings
$100 + 0.05/sq. ft. + 120 I
Fence construction permit and inspection
$50 + 0.05/l. ft. + 50 I
Moving/changing location of building
   Accessory structure
$50 + 0.03/sq. ft. + 50 I
   Principle structure
$275 + 0.05/sq. ft. + 50 I
Multi-family residences: apartment buildings, condominiums, co-operatives, mobile homes in park
$350 + 100 each unit + 125 each unit +25 c of o/unit
Remodeling interior/exterior alteration
$100 + 0.05/sq. ft. + 100 I
Room additions
$100 + 0.05/sq. ft. + $120 I
Single-family residence
$400 + 0.08/sq. ft. + $200 I*
Single-family residence/manufactured
$300 + 0.05/sq. ft. + 100 I
Two-family residence
$450 + 0.08/sq. ft. + 300 I
NOTES TO TABLE:
I - Inspection fees
* - Included in fee, except multi-family residence
 
         (b)   Industrial and commercial buildings.
Accessory buildings (under 400 sq. ft.)
$200 + 0.05/sq. ft. + 50 I
Addition to existing structure
$200 + 0.10/sq. ft. + 150 I
Certificate of occupancy * Included in fee
   Accessory structure
$40
   Principle structure
$75
Demolition
$250 + 0.05/sq. ft. + 50 I
Each structure
$400 + 0.15/sq. ft. + 200 I
Fence construction permit and inspection
$50 + 0.05/l. ft. + 50 I
Moving/changing location of building
   Accessory structure
$175 + 0.05/sq. ft. + 50 I
   Principle structure
$375 + 0.10/sq. ft. + 150 I
Remodeling: interior/exterior alteration
$150 + 0.05/sq. ft. + 100 I
NOTES TO TABLE:
I - Inspection fees
 
         (c)   Miscellaneous.
Contingent/special exception use (government owned not to exceed $500)
$15/1,000
Government, church, education
$300 + 0.05/sq. ft. + 200 I
Multi-purpose/under 144 sq. ft. (mini-barns)
No permit required
Penalty for occupancy without occupancy certificate
   Commercial/industrial, including accessory
$500
   Residential, including accessory
$350
Renewal
   Accessory structures/additions/others
$50
   Commercial/industrial
$250
   Dwellings (one/two/multiple)
$100
Signs
   Under 10 sq. ft.
$30
   10 sq. ft. to 50 sq. ft.
$40
   50 sq. ft. to 75 sq. ft.
$60
   75 sq. ft. to 100 sq. ft.
$80
   100 sq. ft. to 128 sq. ft.
$100
   Portable/tow-in signs (limited to 14 days)
$5
Site inspections
   Regular scheduled (included in fee for permit)
   Failed (second and each subsequent inspection)
      Residential, including accessory
$50
      Commercial/industrial, including accessory
$75
Special inspections (electric/plumbing/misc.)
$50
Swimming pools (18 in. deep or less are exempt)
   Inground
$150 + 0.05/sq. ft. + 75 I
   Above ground
$75 + 0.05/sq. ft. + 40 I
Temporary use
$50
 
      (2)   Application for appeals, special exceptions and amendments.
Appeal
$250
Change of zone classification
$400+ 15/acre
Change in development plan (previously approved)
$500
Developmental standards variance
$400 + 100 for each addition
Land use variance/special exceptions
$400 + 100 each additional
Provisional and record plats
   Overall provisional plat
$500 + 25 per lot
   Record plat
$400 + 25 per lot
   Re-submitted overall provision
$500 + 25 per lot
Replat
   2 lots
$200 + 25 per lot
   3 or more lots
$400 + 25 per lot
Unit development plan
   Final planned development plan
$500+ 10/acre
      Any number of acres
$200 + 3/acre
      Maximum fee
$1,000
   Preliminary planned development plan
$1,000 + 20/acre
 
   (B)   The Building Commissioner shall, in the name of the town, bring actions in the Circuit or Superior Courts of the county for mandatory and injunctive relief in the enforcement of and to secure compliance with any order or orders made by the Building Commissioner, and any such action for mandatory or injunctive relief may be joined with an action to recover the penalties provided for in this section.
(Ord. 2006-01, passed 3-6-2006; Ord. 2012-01, passed 1-23-2012; Ord. 2020-06, passed 11-2-2020)  Penalty, see § 150.99