(A) All materials and methods of installation for extensions or additions to the town’s water and/or sewage systems shall be as specified by the town, prior to any construction or installation by owners or developers.
(B) All construction and installation shall also be inspected and approved by the town’s Utility Superintendent or appointed representative at the time of connection and prior to any backfilling operation.
(C) This right of inspection does not in any way make the town liable or responsible for any items or work inspected.
(Prior Code, § 8:5:06) (Ord. 82-44, passed 5-4-1983)