§ 10-2-15 WATER MAIN CONSTRUCTION NOTES.
   Plans for water main construction within the city right-of-way or easements and within the service area of the Apache Junction Water Utilities Community District (“WUCFD”), the Apache Junction Water District (“AJWD”) or the Arizona Water Company (“AWC”) shall have the following shown on either the cover, note or detail sheet and/or will depict the water construction notes per the WUCFD/AJWD when the water main construction is within its service area:
“CITY OF APACHE JUNCTION WATER MAIN CONSTRUCTION NOTES”
   (A)   “Contractor will expose any lines being tied into to verify location.”
   (B)   “Backfilling shall not be done until lines are inspected and approved by the city engineer.”
   (C)   “Valves shall be furnished and installed by the contractor according to MAG, city supplements, WUCFD/AJWD and/or AWC.”
   (D)   “Backflow prevention assemblies shall be furnished and installed by the contractor according to MAG, city supplements, WUCFD/AJWD and/or AWC. Assemblies 2 inches and smaller shall be placed in a protective cage painted a neutral or earthtone color. Larger assemblies (3 inches and above) shall be painted a neutral or earthtone color.”
   (E)   “Fire hydrants shall be furnished and installed by the contractor, and shall be painted chrome yellow after installation. Approved fire hydrant list is available at the WUCFD/AJWD and/or AWC.”
   (F)   “All service lines shall be Type K copper tubing. The minimum size service line shall be 1-inch. Service lines shall be continuous under pavement without a connection or extension (see Apache Junction Standard Detail AJW-101).”
   (G)   “All taps shall use all bronze double strap service saddle.”
   (H)   “WUCFD/AJWD and/or AWC will install all meters 2 inches and smaller after all appropriate fees have been paid and paperwork completed. Services up to 2 inches shall be installed per Apache Junction Standard Detail AJW-101. Larger meters and services shall be in accordance with Apache Junction City Code Vol. II, § 10-5-3(E) and (F) of this Chapter.”
   (I)   “Pavement replacements shall be made to Apache Junction Standard Detail AJ-200M.”
   (J)   “As-built drawings, certified by the subdivider’s engineer, shall be submitted to and accepted by the city engineer before final acceptance of the work (see Apache Junction City Code Vol. II, Article 10-9, As-Built Requirements, of this Chapter).”
   (K)   “Plans submitted for projects within the AWC service area shall show notes per AWC requirements as approved by the city.”
(Ord. passed - - )