§ 10-2-13 STREET CONSTRUCTION NOTES.
“CITY OF APACHE JUNCTION STREET CONSTRUCTION NOTES”
   (A)   “Exact point of matching termination and overlay of existing street pavement shall be confirmed in the field by the city.”
   (B)   “Driveway locations shall be confirmed or approved by the city prior to curb construction. The developer shall be responsible for coordinating the locations for driveways to avoid conflict with utility services.”
   (C)   “Curb, gutter, sidewalk and pavement shall be swept clean of dirt and debris. New sidewalk shall be cleaned and kept clean during construction if pedestrian traffic is allowed on the sidewalk.”
   (D)   “Gutters shall be water tested in the presence of the city engineer or designee, to ensure proper drainage prior to acceptance.”
   (E)   “Contractor shall continuously reference location of all valves and manholes during construction.”
   (F)   “All underground utilities located in the roadway shall be completed before paving.”
   (G)   “Base course shall not be placed until subgrade has been approved by the city engineer. Pavement course shall not be placed until base course has been approved by the city engineer.”
   (H)   “As-built drawings, certified by the subdivider’s engineer, shall be submitted to and accepted by the city engineer before final acceptance of the work (see As-Built Requirements set forth in Apache Junction City Code Vol. II, Article 10-9).”