§ 8-1-9 PERMITTING.
   (A)   For all zoning districts, aerials that exceed maximum height limits require a height exception except as otherwise provided in Vol. II, § 8-1-10.
   (B)   All city approvals for new aerials and modifications of existing aerial approvals shall be conditioned to require the removal of the aerial and its associated facilities if the aerial is not used for its permitted purpose for a period of 180 days. The property owner or applicant shall bear the entire cost of demolition and site restoration.
(Prior Document, § 8-1-9) (Ord. 985, passed 3-18-1997)