§ 53.056  CRITERIA FOR INFILTRATION SYSTEMS.
   (A)   Infiltration systems shall be sized and designed based upon local soil and ground water conditions.
   (B)   Infiltration systems greater than three feet deep shall be located at least ten feet from basement walls.
   (C)   Infiltration systems shall not be used to handle runoff from commercial or industrial working or parking areas. This prohibition does not extend to roof areas which are demonstrated to be suitably protected from the effects of the commercial/industrial activities.
   (D)   Infiltration systems may not receive runoff until the entire drainage area to the system has received final stabilization.
   (E)   The stormwater infiltration facility design shall provide an overflow system with measures to provide a non-erosive velocity of flow along its length and at the outfall.
   (F)   Areas proposed for infiltration BMPs shall be protected from sedimentation and compaction during the construction phase, so as to maintain their maximum infiltration capacity.
(Ord. 4-2011, passed 10-8-2011)