§ 3-11.04 COLLECTION.
   This fee shall be collected at the time that a building permit is issued, or if no building permit is required for the type of development, at the time of utility hook-up.
('66 Code, § 3-11.04) (Ord. 757-C-S, passed 9-21-89)