Existing impervious surfaces outside the buffer and expanded buffer may be reconfigured using the following criteria.
(1) In-kind replacement of lot coverage is exempt from the reconfiguration requirements of this section.
(2) Except as provided in paragraph (1), reconfiguration of lot coverage shall result in a 10% reduction of the amount of impervious surfaces that exceed the maximum permitted lot coverage set forth in this subtitle.
(3) The Planning and Zoning Officer may grant a modification to the reconfiguration requirements of this section.
(Bill No. 3-05; Bill No. 93-12)