§ 16-4-203. Requirements in addition to the minimum control requirements.
   The approving authority may require more than the minimum control requirements specified in this subtitle if:
      (1)   hydrologic or topographic conditions warrant;
      (2)   flooding, stream channel erosion, or water quality problems exist between the site outfall and the designated point of investigation; or
      (3)   the County has completed a watershed management study that indicates that additional requirements are necessary.
(Bill No. 58-10)