§ 16-3-303. Inspections.
   (a)   Plan kept on site. The developer shall maintain copies of approved erosion and sediment control plans on site.
   (b)   Routine inspection. Every active site having an approved erosion and sediment control plan shall be inspected for compliance with the plan on average once every two weeks.
   (c)   Reports. A written report shall be prepared by the inspection agency after every routine inspection. The report shall describe:
      (1)   the date and location of the site inspection;
      (2)   whether the approved erosion and sediment control plan has been properly implemented and maintained;
      (3)   practice deficiencies or erosion and sediment control plan deficiencies;
      (4)   if a violation exists, the type of enforcement action taken; and
      (5)   if applicable, a description of any modifications to the erosion and sediment control plan.
   (d)   Notice of violations. In addition to the requirements of § 16-5-104, the inspection agency shall notify the on-site personnel or the developer in writing when violations are observed, describing:
      (1)   the nature of the violation;
      (2)   the required corrective action; and
      (3)   the time period in which to have the violation corrected.
(Bill No. 83-15)