(a) Requirements. The erosion control monitoring device is to be shown on the erosion and sediment control plan and shall be an iron survey stake embedded at least 2.5 feet into the centerline of the receiving channel with the elevation of the top of the stake recorded on the stake. At least one device shall be provided for each site outfall. The total number and locations of the devices shall be determined by the Anne Arundel Soil Conservation District.
(b) Repair required. At any time during the construction and before a certificate of completion is issued, any sediment deposition or channel erosion measured at the monitoring device shall be repaired as directed by the Department.
(Bill No. 58-10)