If utilities propose to do excavations in the same paved rights-of-way within a three-year period, the Department shall issue permits for the work in a manner that maximizes coordination and minimizes the total period of construction.
(1985 Code, Art. 25, § 25-3-402) (Bill No. 15-02; Bill No. 63-04; Bill No. 53-06)