The Director may not issue a permit to excavate in a right-of-way that was reconstructed, repaved, or resurfaced in the preceding two-year period unless the excavation facilitates the deployment of new technology or the Director finds other good cause for issuance.
(1985 Code, Art. 25, § 25-3-206) (Bill No. 15-02; Bill No. 63-04; Bill No. 53-06)