Section Number | Title |
Short Title | |
Adoption of Electrical Code | |
Addition – Title | |
Addition – Creation of Enforcement Agency | |
Permits Required | |
Permit Acquisition | |
Addition – Permit Expiration | |
Addition – Schedule of Permit Fees | |
Addition – Fee Refunds | |
Addition – Stop Work Order | |
Creation of Enforcement Agency, of the NEC, is hereby established by adding the following:
The term Code Official is intended to also mean the Building and Zoning Administrator and his or her representatives or designees, who are herewith delegated the same powers, authorities, duties and responsibilities as designated for the Code Official.
Permits required, of the NEC is hereby established by adding the following, including exceptions:
Permits Required Permits shall be required for work contained within the scope of this article.
Exceptions:
1. Replacement of lighting fixtures, receptacles, switches, overcurrent protection devices of the same volt and amperage.
2. The repair or replacement of flexible cords of same volt and amperage.
3. The process of manufacturing, testing, servicing or repairing of electrical equipment or apparatus.
4. No permit or inspections are required for electrical wiring of 50 volts or less
Loading...