15.05.050   APPLICATION PROCEDURES.
   .010   Every application to the Building Official for the installation, alteration and replacement of an Electric Vehicle Charging Station shall be in writing and contain the information set forth in the Application Checklist and such other information as the Building Official may reasonably require to carry out the purpose of this Chapter. The checklist and required permitting documentation shall be available on the City’s website.
   .020   The applicant may submit the permit application and associated documentation to the Building Division of the City by personal, mailed, or electronic submittal together with any required permit processing and inspection fees. In the case of electronic submittal, the electronic signature of the applicant on all forms, applications and other documentation may be used in lieu of a wet signature. In connection with each permit application, an applicant shall:
   .01 Verify to the Building Official’s reasonable satisfaction through the use of standard engineering evaluation techniques that the support structure for the Electric Vehicle Charging Station is stable and adequate to transfer all wind, seismic, and dead and live loads associated with the system to the ground; and
   .02 At the applicant’s cost, verify to the Building Official’s reasonable satisfaction using standard electrical inspection techniques that the existing electrical system including existing line, load, ground and bonding wiring as well as main panel and subpanel sizes are adequately sized, based on the existing electrical system's current use, to carry all new electrical loads.
   .030   If the Building Official determines an application for an Electric Vehicle Charging Station satisfies the information requirements of Subsection .010 of Section 15.05.050 of this Chapter, the Building Official will deem the application complete. If the Building Official receives an incomplete application, the Building Official will issue a written correction notice detailing all deficiencies in the application and any additional required information. After the Building Official determines an application for a Charging Station is complete, the Building Official will process the application for permit review in accordance with Section 15.05.060 of this Chapter. (Ord. 6380, § 3 (part); September 27, 2016.)