STANDARD DETAIL DRAWINGS. | |
Typical detail drawings are as follows: | |
Number | Description |
Trench section, paved areas | |
Trench section, sanitary sewers | |
Pre-cast concrete manhole, sanitary sewers | |
112 | Brick manhole section, sanitary sewers |
Trench section, storm sewers | |
Section through manhole, storm sewers | |
Section through inlet, storm sewers | |
130 | Parallel hydrant installation plan, waterlines |
Hydrant installation, waterlines | |
Alternate hydrant installation, waterlines | |
Section through pavement, concrete pavement | |
Plan of joints, concrete pavement | |
Joint details, concrete pavement | |
Construction joint plan, cul-de-sac, concrete pavement | |
Monument box, concrete pavement | |
Street name signs | |
EDITOR'S NOTE: Standard Detail Drawings Nos. 112 and 130 do not appear in Original Ordinance 69-35, passed October 27, 1969.