These Regulations and instructions are intended to enable a developer or his engineer to prepare his construction plans so that the review and approval thereof will be expedited.
(a) Developers of subdivisions are required to indicate on the drawing the engineering details of all existing and proposed facilities and services, which include street pavements, sidewalks, sanitary and storm sewers, water mains and gas mains. These facilities and services shall be designed by an engineer who must be a registered professional engineer in the State.
(b) Each plat or plan, when filed with public authorities for review and approval, must bear the stamp or the seal prescribed by the State Board of Registration for Professional Engineers and Surveyors. Plans not bearing such stamp will not be given consideration.
(c) All elevations shown on the construction plan shall be referenced to the U.S. Coast and Geodetic bench mark system, where possible. Location and elevation of the bench mark or marks shall be shown on the plan.
(d) All drawings shall be made on sheets twenty-four by thirty-six inches size out of trimming edge.
(e) The plan shall be drawn to a scale of forty feet to the inch. The profile shall be to the same scale horizontally and four feet to the inch vertically. An enlarged drawing to show details shall be made where necessary.
(f) Location and size of all existing features shall be shown as well as any other data which may be pertinent for the City Engineer in reviewing or checking the plans.
(g) Title of the plan must contain the name of the subdivision, street, road and/or court names, city and county. Space shall be provided on the title sheet or the first sheet of the plans for approval by the proper authorities.
(Ord. 69-35. Passed 10-27-69.)
(h) Plans and specifications for the proposed installation shall be approved by the City and the Department of Health for the State for sanitary sewers and water mains before construction is started.
(i) Approval of construction drawings shall be limited to a period of twelve months from the date of approval.
(Ord. 87-18. Passed 3-9-87.)
(j) Separate drawings shall be made for the pavement, water mains, sanitary sewers and storm sewers. However, the gas main may be shown on the water main drawing and the sidewalks may be shown on the pavement drawing.
(k) The Key Plan or small location plan shall be shown on all drawings.
(l) The developer shall file four sets of drawings of the water supply and sanitary sewers with the State Board of Health for approval, etc.
(m) The developer shall furnish one set of reproducible “as built” drawings, from inspectors’ notes, to the City.
(Ord. 69-35. Passed 10-27-69.)