§ 156.08 OPEN CHANNELS.
   This section deals with the design and construction of open channels. While the continued use of natural channels in open space is encouraged, those natural and man-made channels through inhabited areas are to be restricted according to the criteria in this section.
   (A)   Proposed channels. Open channels through areas not presently containing a natural stream, depression, or diversion ditch will be permitted only for the collection of surface run-off from small areas.
   (B)   Channel locations. Man-made channels should be constructed on or behind the rear property lines of lots and will be routed to permanent surface or subsurface outfalls.
   (C)   Collection points. At any point where channel design flow exceeds the maximum allowable depth, velocity, and the like, the storm water must be collected in an approved catch basin, inlet, or culvert and directed through an underground storm sewer system.
   (D)   Private drainage. All open channels shall be placed in private drainage easements. Maintenance shall be the requirement of the property owner.
(Ord. C-604, passed 9-8-86)