All new and redeveloped commercial sites, industrial sites, condominium developments, planned urban developments, and subdivisions are required to submit a Storm Water Management Report to the City Engineer. The Storm Water Management Report must be signed and stamped by a Registered Professional Engineer licensed to practice in the State.
An owner of a development site that was created by demolishing an older existing structure can request, in writing, that the City Engineer exempt him or her from the storm water issues if the total soil surface area being made impermeable is the same or less than the total soil surface area that was impermeable prior to the structure(s) being torn down and removed.