117.02 ENGINEERING AND PLANNING COMMISSION FEES.
PLANNING COMMISSION/ENGINEERING SERVICES:
Site Plans
$125.00 Plus $25/acre ($150 minimum)
Revised/Resubmitted Site Plans
Half the above fee
Waiver of Site Plan Application
$75.00
Conditional Use Application
$45.00
Variance
$20.00 Per variance requested
Replats
$50.00 Per lot created
Rezone/Map Amendments
$100.00 Per lot amended
Street/Alley Dedications
$75.00
Street/Alley Vacations
$55.00 Plus cost of land prorated
General Plan Review (sewer, water extensions, roadway)
$300.00 (credited to inspet fees >$5,000)
Minor Subdivision (with or without plan)
$65.00 Per lot created
Major Subdivision Preliminary Plat
$100.00 Plus $10/lot or acre*
Revised/Resubmitted Preliminary Plat
Half the above fee
Major Subdivision Final Plat
$200.00 Plus $10/lot or acre*
Revised/Resubmitted Final Plat
Half the above fee
Major Subdivision Plan Review
$300.00 Plus $50/lot or acre* (0-99 lots)
Plus $25/lot or acre* (100+ lots)
Revised/Resubmitted Plan Review
Half the above fee
*Per lot or acre, whichever creates the higher fee.
ENGINEERING SERVICES:
Inspection Fees - Utility, Sewer, Roadway, Subdivisions (Based on Engineer’s Estimate or Bid)
2% of Construction Cost up to $250,000 PLUS
1% of Cost from $250,000 up to $750,000 PLUS
0.5% of Cost over $750,000
Overtime/Holiday Inspection (with approval)
$60.00 Per hour
Drive Apron/Sidewalk/Curb
$30.00 Per each
House Number
$5.00
Roadway/Excavation Permit (anywhere in right-of-way)
$35.00 Per address
Roadway Repair - Concrete or Asphalt (By City)
$6.50 Per square foot
Micro Cell Facility/Wireless Support (anywhere in right-of-way)
$250.00
Gas Wells ($125 Application/$2,375 Permit)
$2,500.00
Boring/Monitoring Wells $50.00 Application Plus
$400.00 Per hole drilled
Sanitary Sewer Reimbursement Setup
$100.00
Sanitary Sewer Lateral (see sewer use code)
$100.000 Plus tap fee formula
NOTE: Person or entities subdividing, preparing site plans, or replatting are required to pay the following:
County Recorder’s Fee
Private Surveyor and/or Engineer’s Fees
Cost of Legislation, if applicable, to advertise public meetings and public notices.
(Ord. 18-21. Passed 3-15-21.)