§ 22.60.090.1 CONSTRUCTION INSPECTION.
   (A)   General. All improvements are subject to inspection and testing by the City Engineer or authorized personnel in accordance with the standards and specifications specified and required by this title.
   (B)   Pre-construction conference. Prior to commencing any construction, the developer shall arrange for a preconstruction conference with the City Engineer or his authorized personnel.
   (C)   The City Engineer and his authorized representatives shall have the right to stop any work, refuse to inspect any work, or reject any or all work and construction if it is found that the work is unauthorized, is unsafe in any way to the workmen or the public, is inferior in materials or workmanship, was performed without inspection, or does not meet or comply with city standards, specifications or city-approved construction plans.
   (D)   All work and improvements must be found to conform to the specified standards and specifica-tions as a condition of the city's acceptance of them and the release of any improvement securities therefore.
('86 Code, § 22.60.090.1) (Ord. 4120, passed - - )