10-21-15: APPLICATION MATERIALS:
Development applications for towers shall include written documentation evidencing compliance with each provision of this chapter as well as the applicable zoning regulations in addition to the following supplemental information:
   (A)   A report from a qualified and licensed professional engineer which:
      1.   Describes the tower height and design, including a cross section in elevation;
      2.   Documents the height above grade for all potential mounting positions for collocated antennas and the minimum separation distances between antennas;
      3.   Describes the tower's capacity, including the number and type of antennas that it can accommodate;
      4.   Documents what steps the applicant will take to avoid interference with established public safety telecommunications;
      5.   Includes an engineer's stamp and registration number;
      6.   Includes other information necessary to evaluate the request.
   (B)   Architectural drawings depicting the constructed tower with camouflaging treatment set in the surrounding area. These drawings shall include at least one perspective from the north, south, east and west.
   (C)   An overhead map of the city showing the subject tower's location as well as the location of each of the applicant's existing and planned future tower sites.
   (D)   For all commercial wireless telecommunication service towers, a letter of intent committing the tower owner and his or her successors to allow the shared use of the tower if an additional user agrees in writing to meet reasonable terms and conditions for shared use.
   (E)   Before the issuance of a building permit, the following supplemental information shall be provided:
      1.   Proof that the proposed tower complies with regulations administered by the federal aviation administration; and
      2.   Proof that the proposed tower complies with the emission standards promulgated by the Federal Communications Commission; and
      3.   Report from a qualified and licensed professional engineer which demonstrates the tower's compliance with the aforesaid structural and electrical standards. (Ord. 09/2016, 6-20-2016)