§ 153.156 MAJOR SUBDIVISION DISTRICTS AND GENERAL REQUIREMENTS.
   The following general requirements shall apply to all major subdivisions.
   (A)   A major subdivision shall be permitted in a R, C, or I district only.
   (B)   Each lot in a major subdivision shall be connected to a sanitary sewer system provided by a sanitary sewer utility, or have a soils report or an individual septic system approved by the County Health Department or the State Department of Health as the case may be.
   (C)   Each lot in a major subdivision shall be connected to a public water system provided by a water utility or individual well.
   (D)   A major subdivision, or a lot created as a part of a major subdivision, shall be amended, subdivided, or re-subdivided according to the provisions of this subchapter for major subdivisions.
   (E)   All other subdivision and lot area requirements of this subchapter shall be met.
(Ord. 2020-13, passed 11-10-2020) Penalty, see § 153.156